Our lakeside balau deck in Camperdown is complete. The finished deck extends the outdoor living area beside the house, with timber balustrading framing the water views and access steps connecting the different levels.

The finished deck – 24 October 2026
The completed photographs show the rich colour of the balau boards, the deck running alongside the house, and the balustraded platform overlooking the lake. Timber steps and handrails link the deck to the surrounding ground.




Well done, Team Wood Joint!
From the first framing to the finished result
The photographs below document the earlier construction stages of this completed project.
Earlier construction stages. The lakeside deck taking shape alongside the house.

The structure underneath comes first
Before the balau boards go down, the treated timber substructure has to be set out carefully around the house, existing levels and the edge of the water. These early-stage photographs show the framing before the finished surface begins to hide the work underneath.

Balau decking going down
As the build progresses, the balau deck boards start to define the finished outdoor area and connect the house more directly with the lakeside setting.



Progress update – 20 October 2026
The lakeside deck has moved on since our first photographs. Timber balustrading is now in place along the water-facing edges, and the balau access steps connect the different levels beside the house. The latest photographs show the deck surface, steps and balustrade as work continues.
At the time of this 20 October update, finishing work was still underway. The completed project is shown in the new photographs above.