A good deck starts below the boards. Our 5 m × 3 m balau deck build in Durban North is taking shape, and this update focuses on the work that will support the finished surface: solid concrete footings, a flat and level timber framework, and straight joists.

Following our first update on this new Durban North timber deck, the latest site photographs show the substructure coming together alongside the existing building. The balau boards are still to be fitted, making this a useful opportunity to see the preparation underneath.

Straight timber joists across the raised deck framework beside an existing building in Durban North.
The joists are lined up to prepare a flat, level base for the balau deck boards.

Solid footings in concrete

The deck’s support posts are being secured in concrete footings to provide a firm foundation for the timber structure. Getting the support below the deck right is an essential part of the build, even though much of this work will be hidden once the boards are installed.

The photographs record the construction stage, with the framework, posts and groundworks still visible.

Front view of the timber deck under construction, showing the supporting beam, posts and excavated ground.
The front beam and posts form part of the deck’s supporting substructure.

A level, flat base for the balau boards

Before the balau decking goes down, the tops of the joists are lined up to form a level, flat supporting surface. Each board needs to sit properly across its supports; high and low spots in the frame would carry through to the finished deck.

Time spent setting up the substructure now helps achieve a consistent surface when the balau boards are fitted. The H3 and H4 CCA-treated timber framework forms the base for the 15 m² deck.

View along the parallel joists of the 5 m by 3 m timber deck under construction in Durban North.
Careful preparation of the timber framework comes before fitting the balau boards.

Straight joists mean straight screw lines

The joists are also kept straight and aligned along their length. Because the deck boards are fixed into these joists, their position determines where the rows of screws will run across the finished surface.

Straight joists give us a straight fixing line to follow. Careful screw placement then creates the neat, consistent rows that make a difference to the overall finish. It is a small detail to look for on a completed deck, and it starts with the framework underneath.

Angled view of the raised timber deck frame beside the building, before the balau deck boards are installed.
The 15 m² deck is taking shape beside the existing building.

Next: the balau deck boards

The next stage is fitting the balau boards. As outlined in our original article, the project also includes balustrading on three sides and a trap door to retain access to the existing manhole. The balustrade style is still to be confirmed.

We’ll share more photographs as the deck progresses from exposed framework to finished outdoor space.

Planning a timber deck in Durban North?

Contact Garrick at The Wood Joint on 082 496 5444 or send a WhatsApp enquiry. Send your location, a few photographs and an idea of the deck you have in mind.


2 responses to “Durban North Balau Deck Update: Solid Footings, Level Framework and Straight Joists”

Leave a Reply