Wooden Deck in Scottburgh, South Coast KZN

This was a wooden deck built in balau for a client who had opened a Bed and Breakfast on the coast. As you can see form the pics the wooden deck was built in the front of the property overlooking the sea. There were of course strict time lines in which we had to complete this wooden deck as they had already made confirmed bookings. With these job which are a fair distance from home we normally rent accommodation and pay the builders a live out allowance for food etc. It inevitably pushes the cost of the build up slightly which is unavoidable.

There are some before and after pics in this article. We had to excavate the soil below. It is always best to leave a fair amount of space below the bottom of the structure and the bottom of the deck boards to allow sufficient airflow for water evaporation. If the deck structure is touching the ground then one would need to use H4 CCA Treated timber which has a minimum life span of 20 years in constant contact with wet soil as per SAWPA (South African Wood Preservers Association). H3 CCA Treated pine as a structure which is NOT in constant contact with wet soil has a minimum life span of 50 years if correctly installed. So it makes sense to keep the structure to H3 for cost purposes, and expected minimum life span, but keep it well clear of any soil. By allowing air to flow freely between the structure and the ground keeps everything relatively dry below and the deck structure will last a lot longer. Continual dampness below speeds up rot and premature failure. In this instance we excavated to at least 300mm below the structure.

There was a pool that had been installed prior to our build by Clear Blue Pools – Gary Botha (071 679 1013) and we worked closely with the pool builder so that the concrete ring beam of the pool was set down 60mm from the desired deck height (top of deck). This allows us a 40mm batten on top of the concrete ring beam and a 19mm deck board. 40mm is the minimum we like to allow for this purpose, again to allow for sufficient air flow to keep things dry between the deck surface and the ring beam. These cleats or battens are fixed directly to the concrete ring beam and the rest of the joists which are suspended above soil become a 38 x 114 to give it lateral strength.

The rest of the deck was pretty much the same then as the other decks we’ve built using 19 x 68mm yellow balau deck boards, counter sunk screw holes filled with clear epoxy and saw dust mixture, sanded flat and oiled using a decking oil.

For a free no obligation quote on your deck please call us on 031 – 762 1795 or use the contact us form below.

Balau Wooden Deck, Kloof Durban

 

Here’s a straight forward wooden balau deck we built in Kloof, Durban in October 2018. There were a few angles that had to be cut precisely to finish it neatly but other than that the deck was straight forward to build.

We used an H3 and H4 CCA Treated pine substructure. Because the pine is S5 (Industrial SABS approved grade) it is strong enough to be used as a structure for various building purposes. It is also relatively inexpensive in comparison to other hardwoods that could be used as decking structure. Being S5 it contains a certain amount of knots per square metre and is therefore SABS approved as structural timber. Timber with more knots per square metre is normally used as knotty pine ceiling boards where there is very little structural pressures on the timber. Timber with less knots per square metre is referred to as semi clears or S7 grade. S7 becomes quite expensive and is used as deck boards at times to eliminate knots failing on the deck surface. However because one would need to use twice as much wood (38mm thick) when using pine deck boards, the cost is the same as using a 19mm x 68mm balau deck board at half the quantity of wood. As such we use 19 x 68mm yellow balau deck boards as the surface for most of our wooden decks in Durban. The balau is far more stable being twice as dense and hard with a regular straight grain and as such these balau deck boards don’t twist, cup or bow as easily as pine. With the pine being H3 CCA treated it has a life span of at least 50 years outdoors in the rain and weather.

We added a small flight of open riser steps to this deck to gain access to the garden. These are done in full solid balau using 30mm stock. Normally the stringers are 30 x 215 and the treads are made of multiple pieces of 30 x 102 with cleats fixed to the stringers and the treads are fixed to the cleats. They don’t work that well in pine as the pine becomes very visible throughout and one ends up cladding it anyway which brings the cost back to the same as solid balau. The alternative to open risers steps is to do closed risers where box type steps are made of pine structure and then clad resulting in the riser being closed.

The screw holes of all our decks are counter sunk with a Kalgard decking screw and filled with a clear epoxy and saw dust mixture to match the colour of the wood and then ground flat and sanded smooth prior to oiling the deck. You’ll find other articles on this site where we discuss the pros and cons of using oil vs other finishes available on the market and leaving the deck to naturally grey and weather. If you use the search bar at the bottom right and search for maintenance you’ll find a complete article on deck maintenance.

For a free no obligation quote on your wooden deck in Durban and surrounding areas, please use the contact us form below or you can call us on 031 – 762 1795.

Wooden Balau Deck Built Waterfall, Durban July 2018

This slideshow requires JavaScript.

This wooden deck we built in Waterfall, Durban was part of a new build at Focus on Ithemba along Blessing Ninela Road, Waterfall. They were building a new boardroom and office complex and part of the design was a wooden exterior deck.

The job was referred to us by Mass Landscapes, Miles Steenhuysen, who was contracted to do the landscaping. His details can be found here.

In consultation with Miles and the project manager we designed the deck so as to flow around this office complex comfortably and aesthetically and within budget.

The structure of the deck was the standard H3 and H4 CCA treated pine. H3 and H4 CCA treated pine is suitable for outdoors decks. H3 has a life span of a minimum of 50 years and correctly treated H4 pine can live in the ground in constant contact with wet soil for a minimum of 20 years. These are guidelines provided by www.sawpa.co.za. The full document can be found here.

We used 19 x 68mm yellow balau deck boards as the surface. There is a difference between red and yellow balau. The red balau, which is a bit cheaper in South Africa, is a lot more porous and less dense than the yellow balau and as a result will absorb and retain water more easily than yellow balau and will therefore probably rot more quickly. We use only yellow balau which is the most cost-effective hardwood for decking in South Africa. It is not correct to assume that treated pine is cheaper than balau deck boards. Please see here for an article on the difference between balau and pine in decking.

The building we were attaching this deck to was not completely square with itself as it was an old building that had been extended. As such one needs to be very careful when building wooden decks against walls that aren’t square or straight. At some point there will need to be a correction to eliminate the problem and it needs to occur where it is less visible. Either the deck can be built square to itself but it will highlight the errors on the building or the deck needs to be built off square to take up any difference between the building and the deck in a place where it is less visible and can be concealed.

Screw holes we filled with epoxy and sanded flat. The epoxy used was a clear epoxy which was mixed with saw dust to match the colour. The epoxy in the screw holes prevents water sitting in the counter sunk screw hole and being absorbed up the end grain which would cause rot to set in more quickly. The deck can be oiled after sanding or left to grey naturally.

For a free no obligation quote on timber decking and related construction, we can be contacted on 031 – 762 1795 or use the contact us form below.

Balau pool deck and walkway – Kloof, Durban

This slideshow requires JavaScript.

We engaged with Masslandscapes, a landscaper and garden designer (082 468 3759) on this balau pool deck project in Kloof, Durban to provide a solution for the client who wanted an area alongside their pool that they could utilise more. Before the project started there was the standard paved area of about 1m alongside the pool which was bordered by grass of about 1m and then a flower bed, before dropping down a small bank to the rest of the garden. The client wanted to increase the size of usable area alongside the pool.

Initial designs were to have a very similar layout as per the pics above with a semi-circle sort of node protruding over the bank to gain height and create a look out area overlooking the Kloof Gorge. This proved to be out of budget and would probably have resulted in doubling up sitting area as there was already a large tiled verandah extending out from the living area doors. The final design was settled on which is what you see in the pics.

We needed to excavate some of the garden down and move this top soil for use in another area of the garden. It is always recommended that sufficient space be left below the deck and below the bottom of the lower most bearer or joist to allow enough air flow to dissipate and evaporate any water that settles below the deck. Too often I have seen deck boards rotting prematurely due to insufficient space being left below. Water gets trapped below and the underside of the deck and structure remains damp. I normally recommend at least 150mm below the lowest point of the structure. Once we had enough space below we installed our structure using H3 CCA treated pine. Please see here for an article on the use of CCA Treated pine as structures for decks and balau as deck boards. All cut ends of treated pine, as a matter of course, are re treated with an approved end sealer. When a CCA treated piece of pine is cut it exposes a section that is not treated and can accelerate rot.

Post to ground are set in concrete and installed at the correct distance on the bearers to stop any bounce in the bearer and to provide enough support to prevent the bearer breaking. There are guidelines supplied by engineers for distances that these supports need to be installed. These posts need to be H4 CCA treated pine as they are in constant contact with wet soil.

A lot of this job involved lining up existing paving, pool copings, patio etc. to the deck so the lines were seamless and everything ties in neatly. A walkway, as can be seen from the pics, was created to run alongside the existing raised patio for access to the rest of the garden.

In finishing our decks we fill the screw holes with a clear epoxy mixed with saw dust to match the colour as closely as possible and then grind and sand it flat. Standard wood filler doesn’t quite do the trick and fails with exposure to weather. The filling of screw holes is a very important aspect of deck building. It prevents water sitting in the counter sunk screw hole which would then travel up the end grain of the balau and cause early rotting of the balau deck boards. We use a clear epoxy so that we can match the colour to the deck boards. Off the shelf epoxies are either grey or white in colour and don’t take the saw dust that well to match the colour. Also these epoxies dry very hard. It is better to use an epoxy that is semi pliable when dry. Through seasons of dry and wet, hot and cold, the inside diameter of the counter sunk screw hole will vary ever so slightly. If the epoxy has dried too hard it will cause it to pop out leaving a weak spot on the balau deck board. During maintenance intervals these should be checked and replaced if they have in fact popped.

The deck was oiled using a zero wax content product. The beauty of oil is that it soaks into the wood and therefore cannot peel and flake. A peeling deck is an expensive deck to maintain because you would need to sand off the coating completely to avoid a patchy finish when re-applying the coating. Whereas an oil simply degrades due to exposure to UV over time. A pressure wash and re-oil is all you need to do at maintenance intervals which is relatively inexpensive and easy to do as opposed to sanding the deck again. The oil also allows the natural beauty of the wood to shine through resulting in a more natural wood looking product. Coatings give them the effect of a painted deck especially over time when layer after layer has been applied.

For a free no obligation quote on your timber balau decking, walkways, pergolas and other outdoor timber products, please call us on 031 – 762 1795 or use the contact us form below. We operate throughout KZN.

Balau wooden screens installed in Umhlanga Durban

This slideshow requires JavaScript.

We installed these balau wooden screens in Umhlanga in Durban in early 2018. The brief was to provide some privacy to the upstairs verandah. There was originally a glass balustrade on this verandah and being at the end of a cul-de-sac this property’s verandah was very visible to vehicles and people driving or walking to the end of this cul-de-sac.

We removed the glass balustrade to make way for the wooden balau privacy screens. A balau structure was first installed fixing 40 x 60 vertical posts to the top side of the lower slab and the underside of the top slab to provide a frame on to which we screwed our horizontal balau slats.

When installing screens it is quite common to use different sized slats as we did here. Balau deck boards normally come in two different sizes being 19 x 68mm and 19 x 90mm. 19mm is sufficient thickness for screens and then one can mix the width by using a 68mm board and then a 90mm board. One can also rip a 68mm in half leaving 30mm and use that as well to create a visually appealing screen with differing widths of boards.

Gaps between these boards should ideally be 19mm to allow for wind loading. Obviously the closer the boards the less wind can penetrate the screen thereby increasing the wind loading on the screen. A gap bigger than 19mm results in too large a gap and privacy is sacrificed.

Sufficient vertical supports should be provided for stability and integrity and they should be close enough together so that the boards don’t bow between supports. Balau can normally be spanned about 600mm to 1m between supports to sufficiently pull each board straight to reduce bowing. At times a “strap” can be installed behind the boards to pull them all straight.

It is often a lot cheaper, and just as effective, to use a correctly treated pine structure to fix these boards to. However with a 19mm gap and visibility of the structure as well as visibility from behind, we prefer to use a balau structure. In this instance we used a 40 x 60 balau solid piece from top to bottom which worked well.

These screens can be oiled or left to grey naturally. Either way the life span of the wood is not increased that much be oiling them as balau contains natural toxins which limit insect infestation and oils and resins which repel water and limit rot. If they are to be sealed then an oil is the right way to go. Any other coating that dries on the surface of the wood will eventually peel and flake which will be costly to remove and re-coat.

For a no obligation quote on your timber decking, screens, pergolas etc. please contact us on 031 – 762 1795 or use the contact form below.

Cheap Wooden Deck Builders in Durban

This slideshow requires JavaScript.

I was prompted to write this article on cheap wooden deck builders in Durban for various reasons and to highlight some of the dangers of using the cheapest wooden deck builder that you can find. Being South African we all should know the Afrikaans saying “goedkoop is deurkoop”. Or loosely translated to English “you get what you pay for”. There is no exception in the wooden deck building industry.

One should consider that in order to offer a certain level of service a wooden deck builder needs to charge a certain rate. If that rate is relatively low, in comparison to other quotes, then certain sacrifices need to be made either in terms of the quality of materials that are used, the time it takes to do the job to save on labour costs, the quality of labour used to perform the task or the end profit to the contractor. Or a combination of the above. It also makes sense that it will never ONLY be the profit that is sacrificed when rates are lowered. It will be a combination of all of the components, probably skewed away from profit. On the other hand if rates are extremely high the quality of materials and labour can only reach a maximum level (i.e. the best) and any extra money becomes mere profit to the company.

Reliability of contractors using vehicles that may break down should also be taken into account. If margins are small there is often not enough profit to do the maintenance on vehicles, plant or tools that is required and down time can occur that delays the job being completed on time, or at all. Small labour forces may also be used that are often shared amongst several jobs, again resulting in down time and delays in project deadlines. Furthermore unskilled labour forces may be used directly affecting the quality of workmanship and the life span of the end product.

Of equal concern is the tendency of a contractor to use sub standard materials to save on cost wherever possible. In the wooden deck building industry there are various standards of materials. For instance you get red and yellow balau. Red is cheaper but is inferior and will not last as long. Screws can either be Kalgard decking screws with a life span of 25 years or the normal screws one can buy from the hardware with a life span outdoors of approximately 5 years. It is only in 5 years time that you may realise you have made a costly mistake by choosing the cheapest contractor. Or by pushing prices down to a point where a contractor who normally performs a quality job is forced to cut costs and use sub standard materials.

I am often asked to provide a discounted rate. I have no problem offering better rates based on volume as volume enables me to do the job more efficiently. I have done my costings properly and through a combination of accurate calculations and experience have found a point at which I need to set my rates in order to be able to afford quality materials, skilled reliable labour and maintenance of vehicles, plant and tools in order to build a wooden deck the best way it can be built.

We don’t drive the latest Ford Rangers at The Wood Joint. We run a fleet of 4 vehicles ranging from 10-year-old Isuzus with over 400, 000kms on the clock, serviced and maintained regularly so that they are reliable to newer similar vehicles. As such our rates have been set in order to provide the correct materials, skilled reliable labour and reliable vehicles.

I have a list of sub contractors that I can provide you with who will do the job cheaper than me. I can provide a list of suppliers who will supply cheaper materials. I can also show you a list of jobs where third-party sub contractors have taken short cuts in their pursuit of money due to low rates and jobs that have had the wrong materials used and are now prematurely failing.

At The Wood Joint we use only the correct materials, our own permanently employed crews of skilled deck builders each with his own set of tools and reliable vehicles to get them to work on time. We do not, any longer, use third-party subcontractors. We’ve learnt the hard way. Hopefully we can save you the expensive learning process too through this article. We are not the cheapest, we are not the most expensive either, we are correctly priced to offer the standards of quality and service that you expect.

To read more on balau and it’s characteristics please Balau Sundecks

For a free no obligation quote on wooden decking, pergolas, screens, cladding, pergolas and balustrades please call us on 031 – 762 1795 or use the contact us form below.

Wooden Balau Decking Companies in Durban

This slideshow requires JavaScript.

 

Here’s a wooden deck we at The Wood Joint built in Durban recently. The Wood Joint is a wooden decking company situated in Durban and servicing most of KZN. It was a low-level wooden deck basically at ground level joining the pool to the patio and semi surrounds. The site was situated in la Lucia Durban.

When building a wooden deck that will join a verandah to a pool, one needs to be careful to set the height of the pool correctly. The height to the verandah is of course pretty much set based on what the threshold of the sliding doors are. So working from a datum line of the top of the tiles of the verandah one would set the top of the concrete ring beam of the pool down 70mm from the required height of the deck. This will allow for a substructure of 50mm and a deck board thickness of 20mm (19mm in fact but to keep things simple rounded to 20mm). A 50mm batten fixed to the top of the concrete ring beam of the pool will give sufficient space to allow water to evaporate properly, keeping below the deck as dry as possible, and enough structure to create a positive fixing of deck board to bearer. The distance created between top of deck and pool should be minimal. It is not advisable to go much higher than 70mm because it creates a very big “climb” out the pool (from water level to top of deck).

In this deck pictured you will see we ran the deck boards perpendicular to the verandah and pool side. Using this method it is not that important if the side of the pool is parallel to the verandah as the length of the deck boards can be varied quite easily without noticing any difference in length. On the other hand when the deck boards are run parallel to the pool side and verandah one needs to be careful to get the two as perfectly parallel as possible. Any difference will be visible because a deck board will need to be cut in a wedge shape to complete the space. If the difference is not that great then one can “fan” the deck boards to take up the difference in space by making one end’s gaps slightly bigger than the other end. So on one end a 6mm gap can be left and on the other a 4mm gap (normally 5mm throughout). This gains 1mm per deck board run. After 20 deck boards one can adjust for a 20mm difference in spacing. Another “trick” when running boards parallel to the pool side and verandah is to try to end on a full board rather than a half board. Again space between boards can be adjusted either up or down to try to end on a full board. It is much neater and won’t cause as many problems going forward. From the pics you’ll see we ended the deck on a half board which in this case was unavoidable because of the configuration of paving and deck.

You’ll see from the pics that the garden is mostly left for landscaping until after the deck has been built. Trying to build a deck with newly laid grass and not damaging it is near impossible. Always get you building work done before landscaping.

For a free no obligation quote on your decking requirements in Durban please call us on 031 – 762 1795 or use the contact us form below.

Engineered Hardwood Flooring

This slideshow requires JavaScript.

Hardwood flooring has become ever popular in many countries. In South Africa, home owners are opting for these in preference to the old style parquet and the laminated style of flooring. Hardwood floors go hand-in-hand with luxury, and offer timeless beauty and are low on maintenance. Home owners looking for a classic look might like to consider engineered hardwood flooring. These points should be taken into account, or kept in mind when weighing up the pros and cons of hardwood flooring.

Unlike conventional hardwood, which comes from its raw state and into your home, engineered hardwood is a more complex product which consists of layers. The outermost appearance layer is a hardwood veneer, a thin slice of wood of whatever wood type you prefer. The inner layers are made of plywood, high density fiberboard, or hardwood. These core layers give the product more stability than regular hardwood, while the outer veneer surface gives the floor its aesthetics, its beauty, and, of course, its authenticity.

Engineered hardwood is different to a hardwood laminated ‘wood’ because the surface is made of real wood. While laminated flooring has a core of high density fiberboard, its surface is basically a picture of wood. Laminate is less expensive than engineered and solid hardwood, but has a different look, feel and even sound when walking on it, due to its make up.

Pros:

  • Engineered hardwood flooring is designed to reduce moisture associated with conventional hardwood.
  • The layers block moisture and provide added stability to your floor.
  • This is a low maintenance option because of the fact that Engineered Flooring will not swell or warp.
  • Choosing engineered flooring is considered more environmentally-friendly than traditional hardwood for various reasons.
  • Veneer is sliced very carefully and precisely – it is not cut with a saw. This process produces no sawdust, which means that the entire tree can be used. The sawdust which we know amounts to a significant pile when making hardwood boards is wasted wood.
  • Hardwood trees grow a lot more slowly than the trees used to construct engineered flooring cores. More surface area is produced making veneer, therefore installing traditional hardwood uses many times the amount of slow-growing tree. This makes the replenishing time much longer.

Engineered Hardwood Flooring Cons

  • There are very few disadvantages to this type of hardwood flooring but it is neither a foolproof project and not necessarily the right floor for every application.

Comparable to solid hardwood in terms of cost: –

Engineered floors are still considerably more expensive than laminated floors, tile or carpet. They are, however much more hardy, are low maintenance and will wear a lot better.

That said, one should also take into account the biggest concern as a homeowner … that being avoiding shoddy or inferior engineered work and products, merely because of cost.

Veneers that are too thin will prevent sanding and refinishing opportunities that may double the lifetime of the floor.

Some veneers are so thin and poorly made that they can prematurely warp or fade.

Core layers should still be made from high-quality wood. Some manufacturers try to cut corners by using fiberboard or oriented strand board which might well compromise the stability of your floor and could result in an inferior flooring product.

Your Home is your Castle … quality surpasses cutting corners

It is, without exception, easier to install engineered flooring and the handy man homeowner is often encouraged to install his or her own engineered floors. It is never-the-less, a major project with big financial implications, therefore, I suggest you weigh up carefully, the virtue of employing an experienced craftsman to do the job (who will also guarantee his finished product, surely?) and doing the work yourself …and without wanting to reduce your skill-ability, don’t be too over zealous about your own home improvement skills just to get the job done cheaper! Even for the majority of homeowners who hire a flooring contractor for the job, you’ll save a hefty sum on installation, which is important given that most engineered flooring is more expensive than solid wood.

The cost of high-quality engineered floors (thick veneers) will depend on various issues, the obvious one being the type of wood you choose. In South Africa, imported Indonesian Balau is readily available, is solid, a hard wood and also hard-wearing, able to withstand much more than a softer local wood might be. It lands at quite a reasonable price and is of a superior quality. It is, for example largely used for outdoor decking. Solid wood flooring may be cheaper overall, however it will still take longer to install.

For a free no obligation quote on your solid hardwood engineered flooring please contact us on 031 – 762 1795 or use the contact us form below.

Balau Timber Pool Deck, La Lucia, Durban

Here’s a wooden pool deck we built in La Lucia, Durban recently. In the gallery above you can see pics of the old deck and then pics of the new deck. The old wooden pool deck had started to rot at critical points. The reason for rot in many wooden decks is that the screw holes are not plugged, water gets in and travels up the end grain of the wood resulting in rot at the screw holes. Water travels more easily along the end grain of wood than the side or face grain. So it is important to seal the end grain as far as possible to prevent this. In the case of the end of deck boards the water never really gets trapped so it can drain away quickly enough to prevent rot. However in the case of a screw holes water collects in the screw hole and then has enough time to be absorbed by the end grain before it evaporates. As a standard procedure we fill counter sunk screw holes with epoxy to prevent this from happening.

The epoxy we use is clear so that saw dust can be mixed with it to match the colour as closely as possible. It is also slightly pliable. In hot and cold weather, wood expands and contracts, as does most materials. If you consider a screw hole. The sides of the screw hole will expand thereby closing the screw hole or making it smaller. Whatever is in the screw hole, as a plug, will also expand. So if the screw hole is getting smaller and the plug is getting bigger it makes sense that whatever is in there will likely try to “pop” out. Using a slightly pliable epoxy can reduce the chance of this plug popping out. Hence the reason for not using solid wood plugs cut with a plug cutter. The epoxy should be pliable enough to take up the expansion of the screw hole but hard enough not to degrade due to weather conditions.

We used 90mm balau deck boards on this deck. They are slightly more expensive but some clients prefer them to the standard 68mm boards. Being a wider board one needs to secure them on both shoulders on each joist rather than just a single screw in the middle of the boards, as is the case with a 68mm board.

The job took a bit longer than I would have liked because the substrate that we were building on top of, paving and concrete in this case, were quite uneven so we had to shim and trim joists to get the top of our joists level, flat and at the desired height to be flush with the inside of the house. The jacuzzi cladding was also quite tricky because we had to build a removable structure so that one can access the front of and below the jacuzzi. One side of the jacuzzi step is also wider than the other one so the corner required some fancy carpentry work in order to get the boards to line up and match. I’m glad I took so many pics of the deck before we removed it so that we could copy it exactly.

There were also some wedges that we had to cut along the front edge as the tiles and existing patio were not square to the wall we were building our wooden deck up against. Whenever the existing buildings are not square there is always some sacrifice one needs to make and the trick is to get it least visible to the eye. In this case the client wanted the wedges rather than cutting the tiles or bringing the front of the deck past the line of existing buildings.

For a free no obligation quote on your wooden pool deck, or other balau timber construction, please call us on 031 – 762 1795, or use the contact form below and one of our representatives will get in touch with you.

Wooden Pool Deck Building in Summerveld, Durban

We built this wooden pool deck in Summerveld, Durban in July 2015. There were various challenges in this wooden pool deck build which tested our skills somewhat.

Firstly the ground in Summerveld is very rocky, in fact in some areas it is just one large rock, and when digging you are actually making a small hole in a large piece of rock. There were 21 holes in total on this wooden pool deck so digging was slow and costly.

From the pics you can also see that the edge rim of the pool is a rock feature so it is not level or flat and we had to try to get our deck height to a comfortable level for access from the rock rim of the pool on to the wooden pool deck. We also had to then try to conceal the gap between rock and deck as far as possible and as neatly as possible. In some areas it took a full deck board as a fascia and in other areas it was tapered down to a half width deck board.

We ran deck boards perpendicular to the pool to avoid having long thin slivers of deck board on the pool side. When we started out the deck was planned to be half the finished size. As it took shape it was decided to extend it to its final measurements which was a double-edged sword for us as we had to dig even more holes through the rock but it increased our surface area and therefore our earnings. So we put on our big boy pants and carried on. The ends result was that the deck now extends past the front of the house so that when you are standing on the front you can see all the way along the front of the house.

A pool pump cover was added, a full balustrade around the whole deck and we clad the open vertical gaps so that one cannot see below the deck.

In one of the pics above you can see how we have returned the balustrade at 90 degrees on the first corner. This is to give the long run of balustrade perpendicular to it more strength. Long straight runs of balustrade can often become quite “wobbly” and this corner gives it good strength.

We opened a gap in the existing post and rail fence and built stairs from the garden at house level to the pool with a hinged gate and latch. Because of the angle of the stairs, and to prevent digging too deep into the ground at the top of the stairs, we built a small landing.

A short free-standing balustrade was added along the electric fence to provide some protection from the electric fence when accessing the lower garden on the right hand side of the deck.