This was a wooden deck built in balau for a client who had opened a Bed and Breakfast on the coast. As you can see form the pics the wooden deck was built in the front of the property overlooking the sea. There were of course strict time lines in which we had to complete this wooden deck as they had already made confirmed bookings. With these job which are a fair distance from home we normally rent accommodation and pay the builders a live out allowance for food etc. It inevitably pushes the cost of the build up slightly which is unavoidable.

There are some before and after pics in this article. We had to excavate the soil below. It is always best to leave a fair amount of space below the bottom of the structure and the bottom of the deck boards to allow sufficient airflow for water evaporation. If the deck structure is touching the ground then one would need to use H4 CCA Treated timber which has a minimum life span of 20 years in constant contact with wet soil as per SAWPA (South African Wood Preservers Association). H3 CCA Treated pine as a structure which is NOT in constant contact with wet soil has a minimum life span of 50 years if correctly installed. So it makes sense to keep the structure to H3 for cost purposes, and expected minimum life span, but keep it well clear of any soil. By allowing air to flow freely between the structure and the ground keeps everything relatively dry below and the deck structure will last a lot longer. Continual dampness below speeds up rot and premature failure. In this instance we excavated to at least 300mm below the structure.

There was a pool that had been installed prior to our build by Clear Blue Pools – Gary Botha (071 679 1013) and we worked closely with the pool builder so that the concrete ring beam of the pool was set down 60mm from the desired deck height (top of deck). This allows us a 40mm batten on top of the concrete ring beam and a 19mm deck board. 40mm is the minimum we like to allow for this purpose, again to allow for sufficient air flow to keep things dry between the deck surface and the ring beam. These cleats or battens are fixed directly to the concrete ring beam and the rest of the joists which are suspended above soil become a 38 x 114 to give it lateral strength.

The rest of the deck was pretty much the same then as the other decks we’ve built using 19 x 68mm yellow balau deck boards, counter sunk screw holes filled with clear epoxy and saw dust mixture, sanded flat and oiled using a decking oil.

For a free no obligation quote on your deck please call us on 031 – 762 1795 or use the contact us form below.

Balau Wooden Deck, Kloof Durban

 

Here’s a straight forward wooden balau deck we built in Kloof, Durban in October 2018. There were a few angles that had to be cut precisely to finish it neatly but other than that the deck was straight forward to build.

We used an H3 and H4 CCA Treated pine substructure. Because the pine is S5 (Industrial SABS approved grade) it is strong enough to be used as a structure for various building purposes. It is also relatively inexpensive in comparison to other hardwoods that could be used as decking structure. Being S5 it contains a certain amount of knots per square metre and is therefore SABS approved as structural timber. Timber with more knots per square metre is normally used as knotty pine ceiling boards where there is very little structural pressures on the timber. Timber with less knots per square metre is referred to as semi clears or S7 grade. S7 becomes quite expensive and is used as deck boards at times to eliminate knots failing on the deck surface. However because one would need to use twice as much wood (38mm thick) when using pine deck boards, the cost is the same as using a 19mm x 68mm balau deck board at half the quantity of wood. As such we use 19 x 68mm yellow balau deck boards as the surface for most of our wooden decks in Durban. The balau is far more stable being twice as dense and hard with a regular straight grain and as such these balau deck boards don’t twist, cup or bow as easily as pine. With the pine being H3 CCA treated it has a life span of at least 50 years outdoors in the rain and weather.

We added a small flight of open riser steps to this deck to gain access to the garden. These are done in full solid balau using 30mm stock. Normally the stringers are 30 x 215 and the treads are made of multiple pieces of 30 x 102 with cleats fixed to the stringers and the treads are fixed to the cleats. They don’t work that well in pine as the pine becomes very visible throughout and one ends up cladding it anyway which brings the cost back to the same as solid balau. The alternative to open risers steps is to do closed risers where box type steps are made of pine structure and then clad resulting in the riser being closed.

The screw holes of all our decks are counter sunk with a Kalgard decking screw and filled with a clear epoxy and saw dust mixture to match the colour of the wood and then ground flat and sanded smooth prior to oiling the deck. You’ll find other articles on this site where we discuss the pros and cons of using oil vs other finishes available on the market and leaving the deck to naturally grey and weather. If you use the search bar at the bottom right and search for maintenance you’ll find a complete article on deck maintenance.

For a free no obligation quote on your wooden deck in Durban and surrounding areas, please use the contact us form below or you can call us on 031 – 762 1795.

Wooden Balau Deck Built Waterfall, Durban July 2018

This slideshow requires JavaScript.

This wooden deck we built in Waterfall, Durban was part of a new build at Focus on Ithemba along Blessing Ninela Road, Waterfall. They were building a new boardroom and office complex and part of the design was a wooden exterior deck.

The job was referred to us by Mass Landscapes, Miles Steenhuysen, who was contracted to do the landscaping. His details can be found here.

In consultation with Miles and the project manager we designed the deck so as to flow around this office complex comfortably and aesthetically and within budget.

The structure of the deck was the standard H3 and H4 CCA treated pine. H3 and H4 CCA treated pine is suitable for outdoors decks. H3 has a life span of a minimum of 50 years and correctly treated H4 pine can live in the ground in constant contact with wet soil for a minimum of 20 years. These are guidelines provided by www.sawpa.co.za. The full document can be found here.

We used 19 x 68mm yellow balau deck boards as the surface. There is a difference between red and yellow balau. The red balau, which is a bit cheaper in South Africa, is a lot more porous and less dense than the yellow balau and as a result will absorb and retain water more easily than yellow balau and will therefore probably rot more quickly. We use only yellow balau which is the most cost-effective hardwood for decking in South Africa. It is not correct to assume that treated pine is cheaper than balau deck boards. Please see here for an article on the difference between balau and pine in decking.

The building we were attaching this deck to was not completely square with itself as it was an old building that had been extended. As such one needs to be very careful when building wooden decks against walls that aren’t square or straight. At some point there will need to be a correction to eliminate the problem and it needs to occur where it is less visible. Either the deck can be built square to itself but it will highlight the errors on the building or the deck needs to be built off square to take up any difference between the building and the deck in a place where it is less visible and can be concealed.

Screw holes we filled with epoxy and sanded flat. The epoxy used was a clear epoxy which was mixed with saw dust to match the colour. The epoxy in the screw holes prevents water sitting in the counter sunk screw hole and being absorbed up the end grain which would cause rot to set in more quickly. The deck can be oiled after sanding or left to grey naturally.

For a free no obligation quote on timber decking and related construction, we can be contacted on 031 – 762 1795 or use the contact us form below.

Wooden Balau Decking Companies in Durban

This slideshow requires JavaScript.

 

Here’s a wooden deck we at The Wood Joint built in Durban recently. The Wood Joint is a wooden decking company situated in Durban and servicing most of KZN. It was a low-level wooden deck basically at ground level joining the pool to the patio and semi surrounds. The site was situated in la Lucia Durban.

When building a wooden deck that will join a verandah to a pool, one needs to be careful to set the height of the pool correctly. The height to the verandah is of course pretty much set based on what the threshold of the sliding doors are. So working from a datum line of the top of the tiles of the verandah one would set the top of the concrete ring beam of the pool down 70mm from the required height of the deck. This will allow for a substructure of 50mm and a deck board thickness of 20mm (19mm in fact but to keep things simple rounded to 20mm). A 50mm batten fixed to the top of the concrete ring beam of the pool will give sufficient space to allow water to evaporate properly, keeping below the deck as dry as possible, and enough structure to create a positive fixing of deck board to bearer. The distance created between top of deck and pool should be minimal. It is not advisable to go much higher than 70mm because it creates a very big “climb” out the pool (from water level to top of deck).

In this deck pictured you will see we ran the deck boards perpendicular to the verandah and pool side. Using this method it is not that important if the side of the pool is parallel to the verandah as the length of the deck boards can be varied quite easily without noticing any difference in length. On the other hand when the deck boards are run parallel to the pool side and verandah one needs to be careful to get the two as perfectly parallel as possible. Any difference will be visible because a deck board will need to be cut in a wedge shape to complete the space. If the difference is not that great then one can “fan” the deck boards to take up the difference in space by making one end’s gaps slightly bigger than the other end. So on one end a 6mm gap can be left and on the other a 4mm gap (normally 5mm throughout). This gains 1mm per deck board run. After 20 deck boards one can adjust for a 20mm difference in spacing. Another “trick” when running boards parallel to the pool side and verandah is to try to end on a full board rather than a half board. Again space between boards can be adjusted either up or down to try to end on a full board. It is much neater and won’t cause as many problems going forward. From the pics you’ll see we ended the deck on a half board which in this case was unavoidable because of the configuration of paving and deck.

You’ll see from the pics that the garden is mostly left for landscaping until after the deck has been built. Trying to build a deck with newly laid grass and not damaging it is near impossible. Always get you building work done before landscaping.

For a free no obligation quote on your decking requirements in Durban please call us on 031 – 762 1795 or use the contact us form below.

Wooden balau Deck Built in Umkomaas – KZN South Coast

This wooden deck built in Umkomaas on the South Coast of Kwa-Zulu Natal turned into a very nice job with many extras and a happy client who paid timeously. What a pleasure.

We removed and dumped an existing pine deck that had started to show signs of failure in the deck boards themselves. The structure was still ok as it had been built using H3 CCA Treated pine which is suitable for outdoors for a minimum of 50 years as per www.sawpa.co.za. It was the deck boards that had started to rot at the screw hole due to water sitting in the screw hole for long periods of time. It is very important to firstly close that screw hole at the time of building the deck and then to maintain them going forward to stop any water getting into the screw hole. Water will travel very quickly along the end grain of wood and this screw hole provides an ideal point of entry for water. They are simply filled with a clear epoxy mixed with saw dust to match the colour and then sanded flat before sealing or oiling the deck.

Once we had a clear slate we built a new deck using balau deck boards. We changed the design a few times as we built to accommodate the clients requirements. We tried to create a deck that would flow nicely from one level to the other. The top deck was built flush with the house and then we built steps at a 45 degree angle to gain access to the lower deck around the pool which extended along the front of the lower level sliding doors.

We included a curved front on the upper deck to break the straight lines and then clad that fascia as it was very visible when driving up the driveway. We normally include two deck boards as a fascia to the front edge of a deck to hide the structure below and finish it off neatly. In this instance we added four deck boards on the curve because the driveway is a lot lower then the deck and when driving up the driveway the underside of the deck was the first thing you see when entering the property. The client may still need to add planters with some plants in to completely cover that structure but the 4 deck boards give it a nice broad fascia which hides a lot of the structure.

The stairs were challenging. Originally they were to be curved risers and treads which would have meant either cutting deck boards at an angle and laying them straight or trying to bend the deck boards. The risers would have been easy enough by bending a deck board around the arc, but the treads would have been a bit more difficult because it would have meant bending the board through its width (not thickness). The centre of the circle, was off set to the corner of the deck or the top of the stairs and the centre of the circle occurred in the pool. So all in all not an easy task. Because the arc itself was quite gentle you would not have really noticed that it was curved so we opted for a straight edge to our risers and treads. Much easier and less problems going forward with deck boards trying to return to their original straight position. Often less is more.