Stainless Steel Wire Rope Balustrades, Durban

This slideshow requires JavaScript.

Below is an article on wire rope balustrades to refresh the methods of installing them, display some pictures and highlight some pros and cons of this type of balustrade.

Wire rope balustrades are normally installed when one wants to avoid limiting the view as much as possible whilst still providing a barrier at the end of a deck. As opposed to solid timber balustrades which obstruct the view when in a seated position. A wire rope balustrade limits this as the cables are only 4mm thick.

On a standard 1m high compliant balustrade one would use 8 strands resulting in 9 gaps of 107mm each after taking into account that the capping is 30mm thick. Although the wire rope is tensioned on either end it is not tensioned to guitar string tension and can therefore be pulled open to create a bigger opening than 107mm. Care should therefore be taken when installing these wire rope balustrades if the property owner has small kids. They are not the safest and the height of the deck off the ground should be taken into account when choosing this style of balustrade.

As mentioned above the wire rope has a 4mm diameter. It consists of 19 smaller strands making up one larger strand (1 x19). The other type of wire rope is a 5mm wire rope. This is a 7 x 19. So it has 7 x 19 strands that make one 5mm strand. At The Wood Joint we use only the 4mm (1 x 19) wire rope as this is marine grade stainless steel and won’t tarnish as easily as the 5mm wire rope.

The 4mm rope doesn’t bend as easily as the 5mm rope so it cannot be used in conjunction with turn buckles where the rope needs to bend around the buckle 180º. Instead we make use of a swage and button head system where the wire rope is crimped into a swage on one end and a button head, which is sunk into the timber upright, on the other end. They are much neater than turn buckles but it does result in terminating the strands at a 90º corner and starting a new strand for the next run. As such, posts need to be doubled up so that a new button head can be installed where a swage terminates on the previous run. The end result is a slightly more expensive balustrade but one that won’t tarnish as easily and one that has a much neater appearance.

Care must be taken to cut the wire rope at the right length so as to have enough rope to insert it into the swage but not too much so that it can’t be tensioned properly. Once it is cut and crimped it can’t be re-cut or “uncrimped”.

The swage and button heads should be crimped towards the beginning and crimped twice to avoid failure later on. They can be finished off neatly with a stainless steel dome nut.

We are both suppliers and installers of wire rope balustrades. We own a crimping tool designed for 4mm wire rope which is also available for hire. Call us on 082 496 5444 or use the contact us form below for pricing and availability.

← Back

Thank you for your response. ✨

Balau Duck Boards for Wooden Decks – Durban

Balau pot plant bases Durban

Balau pot plant bases for wooden decks

I have inspected many a wooden deck in Durban where the deck boards beneath a pot plant have started rotting. As can be imagined, rain water and water from watering the pot plant gets trapped below the pot plant and takes much longer to dissipate or evaporate than water collecting elsewhere on the surface of the wooden deck. This of course causes rot to accelerate below the pot plant resulting in premature and costly maintenance.

It can be easily prevented by placing something below the pot plant that is slightly raised off the deck surface and makes less contact with the deck itself. Water can then evaporate or run off more quickly which will slow the rotting process down. All wood will eventually rot and even though balau is more resistant to rot than other species of timber it is not immune to rot. The pot plant base can be moved periodically so that the water trapped between the pot plant base and the deck can also evaporate.

We manufacture pot plant bases in various sizes from balau deck boards that make as little contact with the deck surface as possible and are both pleasing to the eye and effective in resisting rot. They are inexpensive. At the time of writing this article (8 May 2016). they were retailing for approximately R150-00 each, depending on the size. They can be custom-made to fit the pot plant base and will save you a fair amount of money in future maintenance.

These pot plant bases are a joint venture between The Wood Joint and the staff. The builders make them in their spare time and the company recovers a bit for scrap off cuts. We split the proceeds equally.

You can contact us on 082 496 5444 or use the contact us form below. Please provide the size of pot plant base required or the size of the your pot plant so we can work out what will work best.

← Back

Thank you for your response. ✨

Indoor Wooden Balau Pool Deck Built in Estcourt

Here’s an indoor wooden balau pool deck we built in Estcourt KZN recently.  The client had been doing some renovations on his house and had enclosed the pool with brick walls and windows resulting in an indoor pool.  He wanted a wooden deck around it to finish it off nicely.

Careful consideration was needed to ensure that any water from the pool could quickly drain away so as not to remain wet beneath the deck boards for too long.  Of course with an outdoor deck any rain water or pool water evaporates quite quickly and isn’t of that much concern.  Being indoors however this water can get trapped below the deck for some time resulting in premature failure of the timber.  Although the timber is H3 CCA treated, and as such can live outdoors with periodic wetting, it cannot remain wet constantly.  H4 CCA Treated timber is more suitable for damp conditions such as constant contact with wet soil.  But a fair amount of water on an ongoing basis is not a good idea.

In this instance the builder had done a great job in creating a small fall on all four sides of the pool so that any water dripping or splashing on the deck would fall back into the pool rather than sit below the deck.

The job was relatively easy as there was very little difference in distance between the walls and the sides of the pool.  If the wall is not parallel to the pool then it will result in a wedged shaped deck board either up against the wall or the pool.  To counter this one must “fan” the deck boards by making the gaps on one side 1mm smaller than the gaps on the other side effectively gaining 1mm per deck board.  After 20 deck boards you will gain 20mm to make up any difference.

In fibre glass pools one might also find that the edges of the pool are not straight.  Run a fish line along it to see if it bulges in or out and find the straightest side to start your decking.  If it does bulge then you will need to overlap your deck board on the pool side slightly to cover that and keep the deck boards straight.

A simple single deck board as a fascia board on the inside of the pool finished it off nicely.  It was oiled with a deck oil and this deck will require very little maintenance or re-oiling as it is indoors and won’t get any sun.

Call us on 082 496 5444 for a free quote on your decking requirements.  We also supply and install balustrades, pergolas, walkways, bridges, jacuzzi cladding and pool pump covers.

← Back

Thank you for your response. ✨

Wooden Deck and Stairs Built in Umhlanga, Durban

This wooden deck we built for a client in Umhlanga, Durban was a suspended wooden deck about 2.8m off the ground. The idea was to make use of the flat concrete roof as a deck because the views from up there are of Durban Anchorage where ships anchor before proceeding to Durban port.  The views also extend all the way down the Golden Mile of Durban.

We didn’t want too many posts going to ground as the area beneath the wooden deck is still used as an outside patio. So we built our substructure using H4 CCA Treated pine in a 50 x 228 size rather than the normal 38 x 114. This way we could span our wooden joists of the deck across a longer distance without the need to support them below with another beam, and therefore posts. We attached the one end of the row of joists with a T joint to another 50 x 228 beams which carried the one side. The other side of each joist was hung in a custom-made galvanised steel joist hanger. The result was that our entire substructure was in one plane rather than having the joists sitting on top of a beam. It allowed us to keep the ceiling height of the deck higher, without having to increase the height of the top of the deck surface. These pine wooden joists were later sanded and sealed to make them look closer to the balau we installed on top of the pine.

The wire rope balustrade was fairly straight forward and we extended it past the deck on to the concrete slab flat roof.

The challenges in this wooden deck came in building the stairs. We had a fixed height to work with and a limited lateral distance in which we had fit all of our treads and risers whilst still keeping our risers and treads compliant. To add to this we had a window we had to pass to get down quick enough in our stair case in order to miss the window, plaster band and plumbing on the side of the house. The only way possible was to split the staircase into three flights with two landings where the flights turned at 90 degrees. We also had to split each landing into three windings in order to gain an extra two risers per landing in order to finish the stairs where they needed to finish. We adjusted the tread depth to shorten our treads and therefore total lateral distance to basically “sqwish” then all in. Normally we use 3 pieces of 30 x 102 balau for treads with two 5mm gaps between boards resulting a tread width of 316mm. We ripped the middle 30 x 102 to 50mm to reduce this lateral distance whilst still remaining compliant at 264mm but gaining some lateral distance in order to squeeze them all in. We finished it off with balau deck board cladding in order to cover all the pine structure. The job took time but it was well worth the wait. Stairs that look nice, work nicely and remain compliant.

It was all finished with an oil based sealer which penetrates the wood rather than drying on the surface.

Contact us for quotes on your wooden decking, stairs, balustrade and other outdoor timber construction. You can call us on 082 496 5444 or you can use the contact us form below.

← Back

Thank you for your response. ✨

Timber Suppliers in Durban

As a spin-off of our deck building activities in Durban we started buying and selling decking timber. We found that due to the volume of timber we purchase we can secure it at a better rate and therefore provide it to the end-user, or contractor, at competitive rates.

We carry the most common decking timber sizes and species of timber. A brief outline of our stock follows.

H3 and H4 CCA Treated pine which is normally used for substructures. The most common sizes here are 38 x 114 used as joists and 50 x 228 used as beams. We stock them in various lengths to suit your needs. We also stock a 76 x 76 H4 CCA Treated pine square post. Other sizes are available with short lead times.

H3 treated timber is suitable for use outdoors where it is exposed to the elements and is subjected to occasional wetting (i.e. it gets wet, but has time to dry). Timber that is in constant contact with wet soil needs to be H4 CCA Treated. Timber living in fresh water is H5 treated and salt water requires H6 treatment.

We carry both 19 x 68mm and 19 x 90mm reeded (grooved) yellow balau deck boards. Again we stock various lengths to suit your needs from 2.4m to 4.2m lengths. They are all sourced from either Indonesia or Malaysia and are either MTCC (Malaysian Timber Certification Council) certified or PEFC Certified. (Programme for the Endorsement of Forest Certification).

We also stock a range of structural balau ranging from 30 x 40 to larger 30 x 102mm and 30 x 215mm pieces. Although we don’t carry larger pieces, they can be sourced relatively quickly.

Other decking products such as Massaranduba and Garappa are also available with relatively short lead times.

Decking screws, sealing agents and other timber decking supplies are also available to provide a one stop shop for all your decking requirements.

We will also assist in the design of your deck, if required, and we can assist in calculating quantities in order to limit waste.

For a quote on all your decking timber requirements please call us on 082 496 5444 or use the contact us form below.

← Back

Thank you for your response. ✨

Balau Timber Stairs Built in Umhlanga Rocks, Durban

These balau timber stairs that we built in Umhlanga are actually temporary stairs which will be removed at some point. They were built in order to gain access up the bank to a converted container that has been placed at the top. It is for a new development at Umhlanga Ridge and the converted container will be used as a sales office to sell the units. Their life span will depend on how long it takes to sell all the units after which the container and stairs will be removed.

We nevertheless used balau as we needed to create a very upmarket feel as this development is targeted at the high-end market.

Initially we were going to build a platform or landing at the bottom, one at the top and one mid way to break the stairs into two flights. However the total distance did not require that and we settled for a landing at the top and one at the bottom. Normally if the flight of stairs is quite long one needs to split them into two flights with a landing mid way. This is to be compliant with National Building Regulations. It is stipulated for safety reasons because a very long flight of stairs becomes dangerous if not split into two flights.

It is a bit more difficult to build two flights with a landing mid way because one needs to first build your top and bottom landings and then work out exactly at what height the middle landing needs to be. This is so that the two flights can be of equal distance and the risers of the first flight can be equal to the risers of the second flight. If the middle landing is not placed exactly in the middle of the total height, the risers of one flight will need to be different to that of the other flight in order to close the gap between landings. It can also result in a different number of risers.

We used balau stingers, cleats and treads. We left the risers open and installed a balustrade down both sides of the stairs for obvious reasons. The balustrade was also full balau and installed in a vertical picket style with a 102mm capping on top.

The stairs were 1m wide which allows for two people to occasionally walk up and down at the same time. I say occasionally because if it was a busy stair case and people were walking both up and down at the same time regularly then one would need to make the stairs 1.5m wide with a balustrade down both sides. There are other building regulations that stipulate when a hand rail is needed in the middle of the stairs case once it reaches a certain width.

For a free no obligation quote on wooden stairs, decks, balustrades and other outdoor timber construction please call us on 082 496 5444 or use the contact us form below.

← Back

Thank you for your response. ✨

Galvanised Steel and Balau Pergola, Durban

Here’s a steel and timber pergola we installed shortly before shut down in 2015 in Gateway Umhlanga Rocks Durban. It was for a new building called 1 on Lunar neat Gateway Hospital.

Due to the size of the pergola and the distance the beams needed to span between supports, we needed to include steel as the largest solid timber piece one can purchase is a 50 x 228 which needs to be supported every 3m odd to stop it sagging in the middle. Thicker wider pieces are available in laminated pine or saligna. To span over 6m one would need to laminate to 114 x 400 at a cost of more than a steel I Beam.

The steel was fabricated as per a drawing supplied by the client. Because we were directly on the coast, we hot dip galvanised the steel and then installed it. It isn’t sufficient to electroplate and powder coat when one is this close to the coast. Once installed it was painted to match the charcoal grey colour of the rest of the steel on the building. Galvanised steel needs to be acid washed in order to remove the residue left after the galvanising process, dried thoroughly, then primed with a galvanising primer and then two coats of Velvaglo enamel. It will require periodic maintenance by re-coating it.

The timber was cut to size and slotted in and attached to pre drilled and pre fixed tags on the main I beams. By pre drilling the holes for fixing eliminates drilling once galvanising has been done and thereby breaking the galvanising.

The timber was left to grey naturally rather than sealing it with an oil. This won’t shorten the life span of the balau as balau contains natural resins and oils which protect it from both rot and insect infestation. Oiling it merely makes it look different. Some people prefer the oiled looked some prefer the natural grey / silver look. Leaving it to grey naturally also eliminates any maintenance issues going forward. If anything one would just pressure wash it from time to time.

For a free no obligation quote contact us on 082 496 5444, or you can use the contact us form below. We can assist with all your outdoor wooden requirements as well as solid wooden floors.

← Back

Thank you for your response. ✨

Balau Timber Pool Deck, La Lucia, Durban

Here’s a wooden pool deck we built in La Lucia, Durban recently. In the gallery above you can see pics of the old deck and then pics of the new deck. The old wooden pool deck had started to rot at critical points. The reason for rot in many wooden decks is that the screw holes are not plugged, water gets in and travels up the end grain of the wood resulting in rot at the screw holes. Water travels more easily along the end grain of wood than the side or face grain. So it is important to seal the end grain as far as possible to prevent this. In the case of the end of deck boards the water never really gets trapped so it can drain away quickly enough to prevent rot. However in the case of a screw holes water collects in the screw hole and then has enough time to be absorbed by the end grain before it evaporates. As a standard procedure we fill counter sunk screw holes with epoxy to prevent this from happening.

The epoxy we use is clear so that saw dust can be mixed with it to match the colour as closely as possible. It is also slightly pliable. In hot and cold weather, wood expands and contracts, as does most materials. If you consider a screw hole. The sides of the screw hole will expand thereby closing the screw hole or making it smaller. Whatever is in the screw hole, as a plug, will also expand. So if the screw hole is getting smaller and the plug is getting bigger it makes sense that whatever is in there will likely try to “pop” out. Using a slightly pliable epoxy can reduce the chance of this plug popping out. Hence the reason for not using solid wood plugs cut with a plug cutter. The epoxy should be pliable enough to take up the expansion of the screw hole but hard enough not to degrade due to weather conditions.

We used 90mm balau deck boards on this deck. They are slightly more expensive but some clients prefer them to the standard 68mm boards. Being a wider board one needs to secure them on both shoulders on each joist rather than just a single screw in the middle of the boards, as is the case with a 68mm board.

The job took a bit longer than I would have liked because the substrate that we were building on top of, paving and concrete in this case, were quite uneven so we had to shim and trim joists to get the top of our joists level, flat and at the desired height to be flush with the inside of the house. The jacuzzi cladding was also quite tricky because we had to build a removable structure so that one can access the front of and below the jacuzzi. One side of the jacuzzi step is also wider than the other one so the corner required some fancy carpentry work in order to get the boards to line up and match. I’m glad I took so many pics of the deck before we removed it so that we could copy it exactly.

There were also some wedges that we had to cut along the front edge as the tiles and existing patio were not square to the wall we were building our wooden deck up against. Whenever the existing buildings are not square there is always some sacrifice one needs to make and the trick is to get it least visible to the eye. In this case the client wanted the wedges rather than cutting the tiles or bringing the front of the deck past the line of existing buildings.

For a free no obligation quote on your wooden pool deck, or other balau timber construction, please call us on 082 496 5444, or use the contact form below and one of our representatives will get in touch with you.

← Back

Thank you for your response. ✨

Wooden Pool Deck Built in Kloof, Durban

This wooden deck was a simple pool deck that we built in Kloof, Durban. The pool had originally been built at an angle to the house which limited the available space between the house and pool. The client wanted to create a wooden deck that was parallel to the house so that he could maximise the space between the edge of the pool and the house.

As result we needed to build part of the wooden deck over the pool and the trick was to support it sufficiently over about a 3.5m span so that it didn’t bounce or sag. We couldn’t of course put supports or posts into the pool so we increased the size of the beam running over the pool to a 50 x 152. We still had to trim the 152 down to about 140 as we needed to install this beam on top of the existing pool coping, on both sides, and we were limited by how high we could come up from that surface. In these instances one starts “stealing space”. A term we use at The Wood Joint for gaining every available millimetre possible in order to maximise structural strength.

We then clad the downpipes and support posts of the existing awning with deck boards to create two fairly large wooden posts and hide the PVC downpipes. This gave the effect of large wooden posts holding up the awning. The flower boxes were also clad to match the theme.

A small ledge of about 200mm wide was added along the wall running up to the pizza oven at bar height of about 1.2m from ground. A small cupboard was built in the recess that the builder had left on the right hand side of the braai in which glasses and other braai, or bar, utensils can be stored.

Stainless steel hinges were used aluminium knobs were fitted. We used a normal latch system on the inside so that when you close it, it locates behind, and out of sight. We included a single shelf for glasses. We tucked the deck underneath the braai area so that wood and charcoal can be stored there.

This deck was sanded and sealed with an oil based sealer. An oil based sealer is far superior to a water based sealer or mineral based sealer that dries on the surface. Oil cannot peel and flake. It simply disappears with exposure to UV so there is no need to sand the deck in the future.

We are available to quote on your decking needs. Please call us on 082 496 5444 or use the contact form below.

← Back

Thank you for your response. ✨

Balau vs CCA Treated Wooden Deck Durban

I often get asked about using balau as a substructure in a wooden deck. There are various pros and cons of using balau as a substructure in your wooden deck so I thought I would jot it down and in future I can direct clients here who want the ins and outs of using balau as a structure for your wooden deck.

Balau is a very good, hardy and durable wood to use in outdoor wooden decks and other outdoor projects. It contains toxins that limit insects eating it and it is high in resins and oils which naturally repels water and limits rot. All wood will eventually rot. It is just that some will rot quicker as they are less dense and less oily which means they will absorb water more easily, which remains in the wood, causing fungus to grow which breaks down the fibres in the wood and is commonly called rot. This is a simplified explanation but I think it delivers the message accurately. Water doesn’t cause rot. Fungus, as a result of water and sunlight, causes rot.

Balau therefore will rot and I have started documenting some pics of rotten joists that I have come across in my repair work of wooden decks. It may take 15 years for this rot to start but it will happen and when it does repair work can run into thousands if not a complete deck rebuild. Joists are often difficult to access whereas deck boards are not.

On the other hand a piece of wood that has been chemically treated to prevent, or limit rot, will last a lot longer and a pre determined life span can be calculated.

CCA Treatment is a process of pressure treating SA pine. A vacuum is created in a chamber that contains the pine and a solution of copper, chrome and arsenate is introduced which then takes up the void created by the vacuum sucking the solution into the cells. The copper prevents fungus growing which in turn prevents rot, the arsenate keeps the insects away and the chrome binds the two to the wood so that I doesn’t leach out.

Balau is too hard and dense to treat. Pine is a commercially grown timber in South Africa which is inexpensive and very suitable for treatment as it is soft and takes up the solution of CCA successfully. There are various different Hazard Classification or H classifications. Basically H2 is good for indoors (roof trusses etc.) H3 for outdoors exposed to the elements, H4 for in constant contact with wet soil. H5 for submersion in fresh water and H6 for submersion in salt water. A correctly treated piece of pine to H3 will, as per SAWPA guidelines, last in excess of 50 years which is pretty impressive in comparison to a piece of balau that comes with no fixed life expectancy. A poor quality piece of balau may start to fail within 5 years whereas a good quality piece may only start in 15 years. Most of the pics I have documented here are of decks that range in age from 8 years to 15 years. But generally speaking I have found some rot setting in all the decks of 15 years or older.

S5 (SABS Structural grade) Pine is considerably cheaper than balau structural timber. So from an economic point of view it makes sense to use pine in place of other woods wherever possible.

One might now ask why is pine not used on the surface of a deck? Why is balau preferred?

Balau is a very stable wood and therefore expands and contracts less than pine. It is about twice as dense, knot free and doesn’t twist and warp as easily. Pine is soft and with the sun beating on the deck it will tend to crack, twist and warp more easily. To use pine as a deck board one needs to use a 38mm board as opposed to a 19mm board in balau (twice as much wood). Also pine deck boards are normally manufactured from S7 as opposed to S5. S7 refers to the number of knots per square inch (or centimetre) and is therefore a lot more expensive than S5. The cost of pine deck boards is in fact a few rand more per square metre than balau. Hence the reason to use correctly treated CCA pine as a substructure and balau as deck boards. Again pine doesn’t work well in balustrades because twice as much wood needs to be used at S7 grade.

For a free no obligation quote on your sun deck, pool deck, balustrades, pergolas etc., please call us on 082 496 5444 or use the contact us form below.